SJP INFRASTRUCTUREएसजेपी इन्फ्रास्ट्रक्चर
Civil · Electrical · Rooftop Solar · General Contracting

We build, wire and power Chhattisgarh.

SJP Infrastructure takes on construction, electrical installation and grid-connected rooftop solar for homes, businesses and government work, in every district of the state.

33 districts covered 5-year maintenance on solar plants GST registered · 22CZZPP7860H1ZK
What we do

Four trades, one contractor

One team handles the civil work, the wiring and the solar plant, so you deal with one firm from start to finish.

CIVIL

Civil Construction

Buildings and site work built to drawing and specification.

  • Residential and commercial buildings
  • RCC work, boundary walls, flooring
  • Roads, drains and site development
  • Repairs, extensions and renovation
ELECTRICAL

Electrical Works

Safe, tested installations for homes, offices and institutions.

  • House and building wiring
  • Distribution boards and earthing
  • LT lines, poles and street lighting
  • Testing and maintenance
SOLAR

Rooftop Solar

Grid-connected plants that cut your electricity bill.

  • Site survey and system design
  • Supply, installation and commissioning
  • Net-metering paperwork with CSPDCL
  • Help with PM Surya Ghar subsidy
CONTRACTS

General Contracting

Government and private contracts, managed end to end.

  • Tendered public works
  • Material supply and labour
  • Project supervision
  • Documentation and handover
Rooftop solar

From survey to switch-on

How a home rooftop solar plant gets installed and connected to the grid.

  1. Site surveyWe check your roof space, shade, structure and your last few electricity bills.
  2. Design and quoteYou get a plant size, panel layout and a clear written quote.
  3. Subsidy applicationWe guide you through applying on the PM Surya Ghar: Muft Bijli Yojana portal.
  4. InstallationMounting structure, panels, inverter, wiring and earthing, installed by our team.
  5. Net meter and inspectionCSPDCL installs the net meter and inspects the plant.
  6. CommissioningThe plant starts generating and the subsidy claim moves forward.
  7. MaintenanceWe maintain the plant for at least 5 years after installation.

Quick solar size estimate

300 units
Suggested plant size2.5 kW
Roof area needed250sq ft (approx.)
Generation per month300units (approx.)

Rough guide only: 1 kW of panels makes about 120 units a month in Chhattisgarh and needs about 100 sq ft of shade-free roof. We confirm the exact size after a site survey.

Where we work

All 33 districts of Chhattisgarh

From Raipur to Sukma, we take projects anywhere in the state.

Why SJP

Straightforward to work with

One firm, every tradeCivil, electrical and solar under one contract and one point of contact.
Proprietor-ledSatyajeet Pandey is your direct point of contact, from survey to handover.
MNRE standardsSolar plants built to the technical standards and specifications issued by MNRE.
Registered businessGSTIN 22CZZPP7860H1ZK, with proper bills for every job.
Contact

Tell us about your project

Call, email, or send the form as a WhatsApp message.

Phone / WhatsApp+91 91790 50569
Emailsatyapandey1118@gmail.com
ProprietorSatyajeet Pandey
Service areaChhattisgarh, India

This opens WhatsApp with your message filled in. You press send there.